Building the Boundary: Constructing Elegance and Security at SoLé Mia

A selfie of a founder and CEO wearing sunglasses and a hard hat with a crew handling materials on a cart in the background.

SoLé Mia sits between Biscayne Boulevard and Oleta State Park on 184 acres, with a 7-acre private lagoon at its center. The community was designed to bring Miami’s energy together with the natural landscape, and that balance starts at the property line. In 2018, our crew at Galecki Group built the perimeter fencing and railings that define the edges of the neighborhood, and the work has moved through just about every phase you can imagine—excavation, night pours, concrete, landscaping.

Precision installation of the perimeter fencing line along the property boundary.

Starting from the ground

The first photos from the job show the site before much of anything was standing. Telehandlers and excavators were moving sand and clearing the fence line while the residential towers rose in the background. Setting the posts meant working in loose, sandy soil and keeping the line straight over a long run, which is harder than it sounds on a site this size. The black metal fencing had to go in plumb and stay that way through coastal weather, so the footings and alignment got as much attention as the panels themselves.

Working after dark

A project on this schedule doesn’t stop at sunset. The night shots show crews setting posts and working around the gate areas under work lights, with conduit and wiring running across the concrete. The terrain was uneven and the lighting was limited, but the team kept the install moving so the fence line stayed on schedule.

The Galecki Group team installing irrigation lines and preparing the landscaping along the new black metal fence line.

Concrete and gates

The gate and walkway areas required their own sequence. Our team poured concrete footings and approach slabs, then tied the fence posts and gate hardware into them. The photos of the finished concrete show the transition from raw sand to a clean, level surface that meets the railing line. Getting those joints right matters—it’s what keeps the gates operating smoothly and the fence stable for years.

Construction workers in hard hats standing near a blue telehandler and steel grating at a building site.

The last set of images shows the fencing in context, and that’s where the design choice pays off. The vertical black railing works as a boundary without walling residents off from the view. Behind it, the turquoise lagoon and the new plantings along the fence line are visible from the walkway. The fence frames the water rather than hiding it, which fits a community built around its landscape.

What comes next

Finishing the perimeter is one piece of a much larger build. SoLé Mia includes seven miles of walking and jogging trails, a children’s playground, a Reserve Padel Club, a UHealth outpatient facility, and Mater Academy. Our part has been the structure at the edges—the gates, railings, and concrete that hold the line—and we’re glad to see it in place.

More on the community is at solemia.com.

The Galecki Group handles commercial and residential construction across South Florida. If you have a project coming up, get in touch.